It was a wonderful Father's Day (I spent the day working on my Chiefmorton Style Nerf Bars.....1-1/4 Schedule 40 Pipe, weld on 90 degree pipe elbows for the corners and capped with a steel cap).
All that is left is to Tap 12 holes and drill 12 additional holes in the mounting brackets finish spray painting (got them primered tonight).
The should be done just in time for the rally
